Project Overview | |
Implementation Period | November 2019 – Present |
Investor
|
Long Son Petrochemical Co., Ltd. |
Contractor | Posco E&C (South Korea) |
Location | Ba Ria – Vung Tau |
Scope | All construction items |
Project value: | 5 billion USD |
Scale | Capacity 10 million tons per year |
Product Used | MVN SR; MVN SR (TD); MVN WPA; MVN 3000RC; MVN SCC; MVN 300WR(I); Elkem |
The Long Son Petrochemical Complex is the first fully integrated petrochemical complex in Vietnam. Located in Long Son Commune, Vung Tau City, the project includes an olefin plant, a polyethylene plant, and related facilities such as a specialized port and storage tank cluster, along with a central utilities plant. The total investment exceeds 5 billion USD, covering a land area of 464 hectares and a water surface area of 194 hectares (for the port system).
The LSP project applies advanced technologies and world-class standards, ensuring strict compliance with regulations and strong commitments to safety and environmental protection. It also collaborates closely with local authorities to implement a variety of programs aimed at improving the quality of life for the local community.
ICCI's Contribution
International Construction Investment and Consulting Co., Ltd. (ICCI) is honored to be trusted by the Investor, Consultants, and Contractors as the supplier of concrete admixtures for the Long Son Petrochemical Complex project.
We have consulted with Contractors, Consultants, and reviewed the project’s technical documents to advise the Contractors on the use of the following products: MVN SR; MVN SR (TD); MVN WPA; MVN 3000RC; MVN SCC; MVN 300WR(I); Elkem