PROJECT OVERVIEW |
|
Implementation period |
2018 - 2023 |
Contractor |
Joint venture of TRUNG NAM E&C - TRUNG CHINH TC CO., LTD |
Concrete manufacturers |
|
Construction address |
From Nga Tu So to Vinh Tuy Bridge, Hanoi City |
Construction item |
Elevated road |
Project value |
Nearly VND 9,500 billion |
Road length |
5 km |
Products used |
MVN 3000NT, MVN 300WR |
The elevated Ring Road No. 2 stretches over 5 km, with a total investment of nearly VND 9,500 billion, connecting Vinh Tuy Bridge with the Nga Tu So interchange. The lower section, over 3 km long, connects Vinh Tuy Bridge with the Nga Tu Vong interchange.
The project includes the following components: the main bridge (19 meters wide), approach bridges (7 meters wide), and connecting ramps that link to the ground-level roads at three key locations—Vinh Tuy Bridge, Nga Tu Vong, and Nga Tu So. These components serve an important role in enhancing connectivity within the capital city of Hanoi.
ICCI’s Contribution
The Investment Construction & Consultancy International Co., Ltd (ICCI) was honored to be trusted by the Investor, Consultant, and Contractor as the supplier of concrete admixtures for the elevated Ring Road No. 2 project. We consulted with the Contractor, the Consultant, and reviewed the project’s technical documentation to recommend the use of our products: MVN 3000NT and MVN 300WR.