CAO LANH BRIDGE - DONG THAP

CAO LANH BRIDGE - DONG THAP
Date Submitted: 1 năm

Project Overview

Implementation Period

2013 - 2018

Contractors

CRBC Company

Vinaconex E&C Company

Concrete Producer

BRIDGE JOINT STOCK COMPANY NO.12

Scope of Work Super T beam concrete
Project Value 7,500 billion VND

Scale

Length 2,015 meters; width 24.5 meters; height 123 meters

Product Used

MVN 3000-PC2 (Mighty 3000-PC2) , MVN 3000-RC ( Mighty 3000-RC)

 

The Cao Lanh Cable-Stayed Bridge was commenced in 2013 and completed in 2017. It is 2,015 meters long and 24.5 meters wide, featuring 6 lanes-3 lanes per direction, including 2 lanes for cars and 1 lane for motorcycles.

The bridge project was invested with 7,500 billion VND, sourced from non-refundable aid from Australia, loans from the Asian Development Bank (ADB), and the State budget.

 

 

The bridge is designed for a maximum speed of 80 km/h, connecting the two banks of the Tien River, thereby reducing the ferry travel time by approximately 2 hours for local residents and contributing to regional economic development.

The bridge lies on Expressway No. 2, linking Cao Lanh City and Rach Gia City.

ICCI's Contribution:

Investment Construction & Consultancy International Co., Ltd (ICCI) was honored to be trusted by the investor, consultants, and contractors as the supplier of concrete admixtures for the Super T beam concrete section of the Cao Lãnh Bridge Project. We provided consultation to contractors and consultants based on project technical documents to recommend the use of products: Mighty 3000-PC2 (MVN 3000-PC2), Mighty 3000-RC (MVN 3000-RC).

 