PROJECT OVERVIEW | |
Implementation perio |
August 1, 2011 – February 7, 2015 |
Contractors |
CIENCO 4 Corporation Tokyu Corporation |
Project value | 6,742 billion VND, funded by Japanese ODA and domestic capital |
Road length: | 12.2 km long, 80–100 meters wide, including 6 traffic lanes, 2 emergency lanes, and 8 bridges |
Products used | Mighty RC; Mighty 150 |
Vo Nguyen Giap Road (Nhat Tan – Noi Bai Expressway) is the route connecting Nhat Tan Bridge to Noi Bai International Airport. It is part of the Trans-Asia Highway AH14. Construction began in August 2011 and was completed in February 2015.
The project was invested with a total capital of VND 6,742 billion, sourced from ODA loans and domestic funds. The road is 12.2 km long with a cross-sectional width ranging from 80 to 100 meters, featuring a total of 6 lanes - 3 lanes in each direction, 1 emergency lane per direction, and 2 parallel service roads on each side.
ICCI’s Contribution
The Investment Construction & Consultancy International Co., Ltd (ICCI) was honored to be trusted by the Investor, Consultant, and Contractor as the supplier of concrete admixtures for the Nhat Tan – Noi Bai Expressway Project. We consulted with the Contractor, Consultant, and reviewed the project’s technical documents to advise the Contractor on the use of our products: Mighty RC and Mighty 150.