LE VAN LUONG ROAD TUNNEL - HA NOI

LE VAN LUONG ROAD TUNNEL - HA NOI
Date Submitted: 1 năm
                         Project Overview
Implementation period 2020 – 2022
Contractors

Joint venture of Cienco 4 Group JSC – Fecon JSC – Vinh Hung Trading, Consulting and Construction JSC

Joint venture of Transport Design and Consulting Corporation – JSC (TEDI) – Traffic Construction Consulting JSC No.2

Concrete suppliers

Transmeco Concrete One Member Limited Company

Viet Xo Construction and Concrete JSC

Construction location Le Van Luong Interchange – Ring Road 3, Hanoi City
Project value 698 billion VND
Road length 475 meters, width 15.5 meters
Products used MVN 3000-RC ( Mighty 3000-RC)

 

The Le Van Luong Underpass Project, part of Ring Road 3, is one of Hanoi city's six key traffic projects. It was commenced in October 2020 and completed in October 2022, with an investment of 698 billion VND. Upon completion, the project will help alleviate traffic congestion at the Le Van Luong – Ring Road 3 intersection.

 

The tunnel is 475 meters long, 15.5 meters wide, with a height clearance of 4.75 meters, featuring a total of 4 lanes – 2 lanes on each side.

ICCI's Contribution

Investment Construction & Consultancy International Co., Ltd (ICCI) is honored to have been trusted by the investor, consultants, and contractors as the supplier of concrete admixtures for the Le Van Luong Underpass Project. We provided consultation to the contractors and consultants based on project technical documents to advise on the use of the following products: MVN 3000-RC ( Mighty 3000-RC).